A 138 × 28 mm double semi-circular fluted board is the most specified ASA co-extruded wall cladding profile on high-exposure facades — and the most frequently mis-detailed. Specifiers choose it for the deep shadow lines and the timber look, then discover on site that the arc geometry, the cavity depth and the fixing pattern decide whether the facade survives fifteen summers in a desert or fifteen months of salt fog on a coastline. This engineering guide from ANHUI KSL NEW MATERIAL CO., LTD. covers the profile geometry, the ASA co-extrusion chemistry behind colour retention, ISO 9223 salt-spray exposure classes, the 3/4-slot Great Wall panel alternative, and the fixing rules that keep a vented rainscreen working.
Executive Summary — What Actually Determines Facade Life
|
The profile is composed of two 45 mm radius semi-circular ribs on a 138 mm module, extruded with internal ribs that divide each arc into hollow chambers. Three engineering consequences follow from that geometry, and each one has to be respected on site.
A 28 mm projection casts a shadow band roughly 20–26 mm wide under midday sun at 60° elevation. That shadow is what makes the facade read as real timber from 30 metres away, but it also means the board face is never fully washed by rain. On a dusty desert site the rib valleys collect fines, so specify a light colour and a matte, micro-textured cap rather than a high-gloss finish.
The hollow chambers raise the second moment of area without adding mass, which is why a 28 mm deep profile can span 600 mm batten centres vertically where a 10 mm flat panel would need 300 mm. The trade-off is that screws must land on the flat fastening flange between arcs — never on the crown of an arc, where the shell has no bearing surface and the fixing will crush the chamber.
The tongue-and-groove edge on the 138 mm board is a loose interlock, not a watertight joint. It is designed to conceal the fixing line and allow movement. Treat every joint as a drainage path, keep a 3–4 mm gap at board ends, and never seal the vertical joint with silicone — trapped water behind a sealed joint is the mechanism that ruins composite cladding in wet climates.
Cross-section: 138 mm module, 28 mm projection, 45 mm arc pitch, hollow chambers and a flat fastening flange between ribs.
Traditional WPC cladding is a single homogeneous extrusion. Wood flour sits at the surface, absorbs moisture, supports mould and greys within two to three seasons under high UV dose. ASA co-extrusion changes the surface chemistry rather than adding a coating: the core and the cap are extruded through a single die while both are molten, producing a fused interface rather than an adhesive bond.
ASA is a terpolymer of acrylonitrile, styrene and acrylic ester. The acrylic elastomer phase absorbs UV energy and dissipates it as heat without chain scission; the styrene-acrylonitrile matrix holds the pigment and resists hydrolysis. Compared with ABS, ASA keeps colour and gloss roughly three to five times longer under the same UV dose, which is why it is used on automotive exterior trim and on facade profiles.
Accelerated weathering hours mean little without the irradiance behind them. A Gulf or Australian facade can receive 6,000–7,000 MJ/m² of annual UV, while a northern European facade receives 2,500–3,000 MJ/m². When a supplier quotes "3,000 hours QUV", ask for the standard (ISO 4892-2 or ASTM G154), the cycle, the irradiance level and the measured colour change ΔE. A 3,000-hour test at 0.76 W/m² is a realistic proxy for a decade of Gulf exposure; the same number of hours quoted without the irradiance figure is marketing.
The cap protects against UV, moisture ingress and surface scratching. It does not make the board structurally stronger, and it does not survive a solvent. Two site rules follow: clean with pH-neutral detergent and a soft brush, and never use acetone, xylene or aggressive graffiti removers on a capped face. Where a facade will be exposed to solvent-based cleaning programmes, specify a sacrificial clear coat on the cleaning schedule rather than relying on the cap alone.
Water beading on a capped WPC face — the same polymer shell that keeps moisture out of the core also carries the pigment.
On a seafront project the cladding board is rarely the weak link. Chloride attack concentrates on the things holding it up: the aluminium or steel sub-frame, the stainless fasteners, the cut edges of the board and any dissimilar-metal contact. This is where composite facades fail in ISO 9223 category C4 and C5 environments, and it is entirely preventable at the specification stage.
Within 500 m of the shoreline, or on any facade exposed to prevailing onshore wind and spray, specify 6063-T5/T6 aluminium with a minimum 15 µm anodised or powder-coated finish, or hot-dip galvanised steel at 85 µm minimum coating thickness. Electro-galvanised battens, common on domestic installations, are a false economy in a C5 zone. Fasteners should be A2-70 as a floor and A4-70 where the facade faces open sea.
Every board cut on site exposes the WPC core, because the co-extruded cap only covers the extruded perimeter. Cut ends must sit in a drained, ventilated position — typically behind a corner trim or an end cap — and never be butted against a horizontal ledge where chloride-laden water can pond. Where a cut edge is visible, close it with the matching PVC or aluminium end profile; painting the cut face is a temporary measure, not a detail.
Aluminium sub-frame with stainless fasteners is a benign couple in dry conditions and an aggressive one when wet and chloride-rich. Use isolating washers or a coated screw head, and keep the aluminium clear of bare galvanised steel brackets. On marine facades, the cost of isolation washers is trivial against the cost of a re-clad at year eight.
KSL extrudes both families from the same ASA-capped compound, so the choice is aesthetic and structural rather than chemical. The arc profile reads as a rounded, hand-finished timber batten; the Great Wall slat profile reads as a machined board with crisp square shadow gaps and a stronger horizontal rhythm.
Selection criterion | 138 × 28 mm Double Semi-Circular | 3-Slot / 4-Slot Great Wall Panel |
|---|---|---|
Visual character | Rounded batten, soft shadow, hospitality and residential | Flat slats with square reveals, sharper and more commercial |
Shadow depth | 28 mm projection — deepest read at distance | Shallow reveal — consistent at close range and on soffits |
Best orientation | Vertical, full-height runs between floor bands | Vertical or horizontal; horizontal needs extra mid-span support |
Dirt behaviour | Rib valleys trap fines — specify light matte colours in dusty climates | Flat faces self-clean better in rain-washed zones |
Typical application | Resort and villa facades, feature walls, entrance canopies | Retail and office envelopes, soffits, boundary screens, interiors |
Curved work | Not bendable — curve with faceted bays, not by forcing the board | Also not bendable; use a dedicated curved profile for radius work |
The practical decision rule used on most projects: if the facade is seen from the street or from a pool terrace at more than ten metres, the arc profile earns its cost through shadow depth. If it is seen at hand height — entrance walls, soffits, retail frontage — the Great Wall slat gives a cleaner line and is easier to keep clean.
The 138 × 28 mm board in walnut: two semi-circular ribs per 138 mm module, ASA cap co-extruded over a hollow WPC core.
Most cladding disputes trace back to a specification that said "WPC cladding, wood colour, UV resistant" and nothing else. The table below lists the properties worth naming explicitly, together with the test method that proves each one. Values are typical for ASA-capped co-extruded profiles; always require the batch-specific report rather than a generic brochure figure.
Property | Test method | Value to specify |
|---|---|---|
Water absorption, 24 h | ASTM D570 / EN 15534-1 | ≤ 0.1% (capped face), ≤ 2% on cut core |
Accelerated UV | ISO 4892-2 / ASTM G154 | 3,000 h, ΔE ≤ 2.5, no chalking |
Flexural strength | ISO 178 / ASTM D790 | ≥ 25 MPa, modulus ≥ 2,500 MPa |
Thermal expansion | ISO 11359-2 | 0.04–0.06 mm per metre per °C |
Reaction to fire | EN 13501-1 | B-s2,d0 or better — confirm on the report, not the datasheet summary |
Impact resistance | EN 477 / falling ball | No cracking at 1 kg / 1 m at 23°C and −10°C |
Dimensional stability | EN 15534-1, 80°C | ≤ 0.3% linear change |
Heavy metals / SVHC | RoHS, REACH SVHC, EN 71-3 | Lead-free, pass on all three |
Two clauses are worth adding that suppliers rarely volunteer: a statement of the cap thickness in micrometres, and a sample retention clause requiring the approved sample to be sealed and held for the duration of the warranty. Both convert a vague promise into something that can be tested at year seven.
A composite cladding facade is a drained and back-ventilated screen. It works when water that passes the board line can drain out and air can move behind it. It fails when the board is fixed directly to masonry, when the cavity is blocked at the head, or when battens are spaced on the assumption that the board is decorative rather than structural.
Parameter | Specification for 138 × 28 mm | Reason |
|---|---|---|
Batten spacing | ≤ 600 mm c/c vertical; ≤ 400 mm at corners, openings and the top storey | Wind suction peaks at edges and corners |
Ventilated cavity | ≥ 25 mm clear, open at head and base | Drainage and evaporative drying |
Fixing position | On the flat flange between arcs, pre-drilled ø 8 mm | No point load on a hollow chamber crown |
Fastener | A2/A4 stainless, pan head with isolating washer, 2 per board per batten | Chloride resistance and thermal slip |
End gap | 4 mm per 4 m board length, plus 10 mm at walls and soffits | 0.05 mm/m/°C over a 60°C surface swing |
Vertical joints | Loose interlock, never sealed | Sealing traps water behind the board |
Fire stops | At every floor slab and at cavity widths over 50 mm | Cavity fire spread control |
Movement joints | Align with the building's structural joints, every 6–8 m | Decouples cladding from frame movement |
Sequence matters as much as the numbers. Install the battens and flashings first, verify cavity continuity and drainage at the base, and only then hang boards from the bottom up so each course overlaps the fixing line below. Boards installed top-down leave the crew working over unsupported edges, which is where most damaged profiles originate.
Full-height vertical runs in walnut on a concrete frame — boards stop at the slab band, so each storey is an independent drained bay.
The following is a reference specification assembled from KSL's technical file for a hot-arid coastal project — a 1,200 m² facade package on a low-rise resort, four hours inland from the coast, with a salt-laden onshore wind for part of the year. It is presented as a design worked example, not as an installed reference; the numbers show how the decisions above interact.
Exposure inputs: peak surface temperature 78°C in July, annual UV dose approximately 6,800 MJ/m², ISO 9223 corrosivity category C4 at the seaward elevation and C3 inland, design wind suction 1.8 kPa at 12 m height.
Resulting specification: 138 × 28 mm ASA-capped boards in light oak on the seaward elevation to limit solar gain and hide dust, walnut on shaded courtyards; 6063-T5 aluminium battens at 500 mm centres, 400 mm within 1.2 m of corners and openings; 25 mm minimum cavity with continuous base ventilation and an insect mesh; A4-70 stainless fasteners with isolating washers on the seaward face and A2-70 elsewhere; stainless starter track at the base with a 20 mm drip; fire stops at each floor band.
Quantities implied by the geometry: a 138 mm module yields roughly 7.2 linear metres of board per square metre of facade before allowance for openings and waste; at 10% cutting allowance the package needs approximately 9,500 linear metres of profile plus 1,900 metres of batten, 6,400 fasteners and 220 corner and end trims. Those ratios are what a distributor should use to sanity-check a quotation — a bill of quantities that implies materially less trim than this has usually omitted the corners.
Maintenance plan written into the specification: one rinse per quarter in the dusty season, pH-neutral detergent twice a year, annual inspection of the base ventilation path and of the fasteners on the seaward elevation for the first three years. That is the entire regime — no oiling, no staining, no repainting, which is the commercial argument that usually decides the tender.
Confirm the profile geometry in writing — module width, projection, arc pitch and flange position. A "138 mm fluted board" from two suppliers can differ by 6 mm in projection, which changes the shadow line and the batten spacing.
Ask for cap thickness in micrometres, not "co-extruded". Below 0.4 mm the shell is thin enough that site abrasion reaches the core.
Request the batch UV and water absorption reports against ISO 4892-2 and ASTM D570, with the production date on the same page.
State the ISO 9223 corrosivity category and let it drive the sub-frame and fastener schedule; do not leave it to the installer's default.
Detail the head, base, corner and opening before pricing. Trims are typically 8–15% of the cladding package and are the first item cut from a competitive bid.
Verify heavy-metal and SVHC compliance (RoHS, REACH) for projects shipping into the EU, UK and North America, and keep the declaration with the project file.
Retain a sealed sample for the warranty period so colour and texture can be adjudicated against something physical.
ANHUI KSL NEW MATERIAL CO., LTD. supplies ASA co-extruded wall cladding from its Hefei factory with CAD details, installation manuals, colour samples and third-party test documentation for each shipment. Free samples and project-specific technical packs are available on request.
Focus Keywords & Related KSL Systems
ANHUI KSL NEW MATERIAL CO., LTD.Factory-direct ASA co-extruded wall cladding for desert, coastal and high-UV facades. 25-year limited warranty, free technical samples and full project documentation packs. Official email: Dora@China-wpcdeck.com | Ella@China-wpcdeck.com Official Alibaba Store / Verified Supplier Store Instagram | TikTok | Facebook | Twitter (X) Factory Address: Hefei, Anhui Province, China | https://www.china-wpcdeck.com/ |
Add:
Circular Economy Demonstration Park, Suzhou, Anhui Province
Tel: whats App
+86-13866161113